DESIGN AND IMPLEMENTATION OF COMPUTERISED STADIUM MANAGEMENT INFORMATION SYSTEM
Sold By: Joe Project Store | Item Type: Project Material | Report this? | Attributes: NIL pages | 1-5 chapters | Amount: ₦5,000 | 5 orders. | Marked useful: 8,517 times
INSTANT PROJECT MATERIAL DOWNLOADOVERVIEW OF THE EXISTING SYSTEM
3.1 GENERAL DESCRIPTION OF THE EXISTING SYSTEM
In the existing system, the stadium operates indifferent kind of manual processing which includes ticket processing and file maintenance. The organization depends on an individual that is employed to keep data which is done manually with the use of paper and other things. Everything that is done in the existing system are manually and not all that reliable.
3.2 METHODS OF DATA COLLECTION USED
The investigation of the current system was in order to obtain detailed fact about the application area to be designed in the investigation of research, the methods used were interviewing and evaluation of office files and tickets.
INFORMATION
Oral interview was conducted with the management of the organization. Reliable data was gotten based on the questions that I asked the management. This method yield the most profitable result as it is obtained by physical contact, hence a firsthand information is gotten. The essential element of the interview is obtained directly and in a short time in other methods. Because immediate feedback is gotten, it gives the opportunity to ask questions and hence obtain a detailed response.
This material content is developed to serve as a GUIDE for students to conduct academic research
DOWNLOAD THIS PROJECT MATERIAL NOW!
Advertise Here
Not what you were looking for? Perform a search
What's your project topic?
Comment on Facebook:
Related Project Materials
- 1.
INVESTIGATING FORENSIC AUDIT AS A PANACEA FOR PREVENTING CORPORATE FRAUD IN CAMEROON'S PUBLIC SECTOR
CHAPTER ONE INTRODUCTION 1.1 Background of the study The proliferation of financial crimes in these developing economies is concerning and catastrophi...More »
Item Type: Project Material | 54 pages | 818 engagements |
- 2.
INTERNAL AUDIT: EXAMINING ITS ROLE IN ENSURING ETHICAL CONDUCT IN CHENWI-ASSOCIATES, CAMEROON
INTERNAL AUDIT: EXAMINING ITS ROLE IN ENSURING ETHICAL CONDUCT IN CHENWI ASSOCIATES, CAMEROON CHAPTER ONE INTRODUCTION Background of the Study Auditin...More »
Item Type: Project Material | 54 pages | 707 engagements |
- 3.
EXTERNAL AUDIT AND QUALITY OF ACCOUNTING AND FINANCIAL INFORMATION IN THE CAMEROONIAN PUBLIC SECTOR
CHAPTER ONE INTRODUCTION 1.1 Background of the study The main purpose of external audit as a governance mechanism is to enhance the accuracy and trust...More »
Item Type: Project Material | 54 pages | 787 engagements |
- 4.
EXAMINING THE ROLE OF FORENSIC AUDIT IN DETECTING FINANCIAL FRAUDS IN THE CAMEROONIAN PUBLIC SECTOR:...
CHAPTER ONE INTRODUCTION 1.1 Background of the study Forensic auditing and forensic accounting are often used interchangeably. It has been officially ...More »
Item Type: Project Material | 54 pages | 713 engagements |
- 5.
EXAMINING THE IMPACT OF THE AUDIT REPORT ON INVESTMENT IN FINANCIAL INSTITUTIONS IN CAMEROON
CHAPTER ONE INTRODUCTION 1.1 Background of the study According to the Companies Act, all registered companies must present audited accounts to their s...More »
Item Type: Project Material | 54 pages | 693 engagements |
- 6.
EXAMINATION OF CHALLENGES ENCOUNTERED BY INTERNAL AUDITORS IN PUBLIC SECTOR AUDIT OF CAMEROON
CHAPTER ONE INTRODUCTION 1.1 Background of the study The demand for internal auditing mostly arises from the necessity for an independent verification...More »
Item Type: Project Material | 54 pages | 743 engagements |